The first of the three sections completed for the fence for the Downing Children’s Garden at Botanica

There are now 3 of the 6 sections done for the fence project. At some point in the near future, we will be getting better photos with a good background. For now, these are taken in the shop as the process rolls along. These pictures have been taken over the last month or so.

Even though the heat index is getting pretty high, I’m trying to get up by 5:00 a.m. to beat the heat. It is rolling along, and I hope to have it completed by the end of the summer.

Please let me know what you think. It is wonderful to hear back from those who visit the site–even if it is just a word or two. I appreciate it.

Wrapping the vines for strength and to tie it all together

Wrapping the vines for strength and to tie it all together

Lay out w/vine and leaf work
Lay out w/vine and leaf work
Rusting after the rust treatment

Rusting after the rust treatment